03x03 - Concrete

Episode transcripts for the TV show, "How America Works". Aired: September 20, 2021.*
Watch/Buy Amazon



Showcasing the many individuals who work around the clock to keep America's infrastructure in working order.

03x03 - Concrete

Post by bunniefuu »

- [Radio] Five, four,

three, two, one.

(limestone exploding)

- And just like that,

(upbeat rock music begins)

another perfectly good camera

makes the ultimate sacrifice

for another outstanding

episode of How America Works.

Our camera, by the way,

was crushed by several

tons of falling limestone.

Limestone is a key

ingredient of cement.

Cement is a key

ingredient of concrete.

And concrete, of course,

is a key ingredient

of civilization.

In the entire

history of the world,

no other construction material

has rivaled the impact

of concrete on humanity,

nothing else even comes close.

So tonight's episode starts

with a really big bang

that led to a really big

boom, a construction boom,

that laid the

foundation, literally,

for How America Works.

(workers chattering)

If ever there was a topic

to pour over, as it were,

it's concrete.

And it's because this

simple blend of stone, sand,

and water, in the

proper proportions,

can shape some of the most

awe-inspiring structures

known to man,

skyscrapers, bridges,

and the countless

other immovable objects

that surround our

everyday lives.

Small wonder then

that concrete is also

the most widely used manmade

product on the planet,

with American consumption

tipping the scales

at nearly 300,000 tons a day.

Lately though,

what with building booms

kicking off nationwide,

the demand for

this all-important

construction material

is skyrocketing,

which some might

call a good problem

if you're one of the 2000+

concrete manufacturers

across the country.

But that kind of demand

comes with no small

amount of challenges.

(cement dripping)

Take GCC's plant in Southern

Colorado, for instance,

where workers are

cranking 24/7/365

to create one of concrete's

main ingredients, cement.

Yeah, there's a difference

between concrete and cement

and where once this

facility shipped out

4,000 tons of it a day,

they're now racing to make that

a far more ambitious 5,500 tons.

(limestone explosions)

And at the forefront

of that mission,

aside from 17 tons

of expl*sives,

are guys like Heavy Equipment

Operator, Anthony Jones.

- [Anthony] Gonna be

cruising down here

soon start crushing some

limestone for the plant up there

to make some cement.

So get to play in the mud today.

- [Mike Rowe Voice

Over] For that,

Anthony will be operating

one of his favorite toys,

this 80-ton wheel loader,

which can feed freshly

blasted limestone

into the plant's resident

crusher like nobody's business.

- All these boulders and

all these bigger rocks

that we have in the blast,

we'll wind up taking

it and scooping it up.

Just don't want any of

it to fall down on you

and it can crush you

or come into your cab.

Watch your mirrors and make

sure everyone's outta your way.

Make sure no one's behind

you and roll on off.

- [Mike Rowe Voice Over]

Limestone like this

will comprise 85% of the

cement made here today.

So it's on Anthony

and his colleagues

to haul and crush 10,000 tons

of it before quitting time.

- [Anthony Voice Over] We

are getting busier and busier

each year that I've been here.

It seems like we just

keep producing more

and more each year

and it's just crazy how the

world needs that much cement.

- [Mike Rowe Voice Over]

He's not kidding you know.

Over the past decade,

the demand for cement

has risen by more than

50% in the United States.

But meeting that demand

comes at a price,

because when working with a

material as tough as limestone,

even a crusher as

advanced as this one

could occasionally

get all choked up.

(crusher steaming)

(buzzer alarm sounding)

- See up there?

You can see the belt that's

on the outside of the belt.

It shouldn't be like that.

It needs to be on the

inside of the belt.

So all this rock,

including all this,

should not be here.

(rocks falling)

All of this is

sh**ting out right now.

We have the call control room,

see if they get maintenance

down here to give us a hand.

But this is definitely

something that could hurt us.

- [Mike Rowe Voice Over] While

Anthony and his colleagues

call for help two miles away,

the limestone they've

harvested, so far,

is steadily feeding

into GCC's main facility

where keeping an eye

on the whole operation

falls to Control Room Leader,

d*ck Federico.

(music stops)

- This is pretty much where

all of the action happens.

We monitor everything

from the quarry

and on through to the raw mill.

And then from there, we're gonna

go over to the finish mill.

The finish mill is what actually

makes the final product.

- [Mike Rowe Voice Over]

It's a lot to keep tabs on,

but here's, roughly,

how the process of

making cement happens.

(soft tense music begins)

First, you need a

whole lotta limestone,

along with some sand and clay.

Then those ingredients are

crushed into a fine powder

before being fed

through a preheater,

followed by a 3000 degree kiln.

That kiln will melt

the material down

into marble-sized ba*ls

known as 'clinker,'

which is ground, once

more, into a fine powder

along with a hefty

dose of gypsum.

Now you've got cement,

which can be mixed

with gravel, sand,

or any number of other

fillers to form concrete.

That's how it should go

anyway. (machine whirring)

- Look at this right here.

(machine alarm beeping)

- [Crew Member] Oh man.

- [Mike Rowe Voice

Over] But already,

there seems to be a problem

somewhere in the system.

- You see how the

pressure's all dropped?

Yeah, look at that, look

at the tower pressures.

If you look at this

graph right here,

normally, this trend line

is gonna be fairly flat.

When you see this, you

see this sharp drop off,

usually that's an indicator

that something is plugged up

in the preheater tower.

(air whooshing)

- [Mike Rowe Voice

Over] That tower

is a nine-story tall structure,

designed, as the

name might suggest,

to preheat raw materials before

they're fed into the kiln.

And when it becomes clogged,

the whole operation can

grind to a standstill,

but not if d*ck can help it.

- [d*ck Voice Over] We

are in a sold out market.

This plant is completely

sold out this year

and next year as well.

So any time that we have

any kind of hiccups,

any kind of issues like this,

we try to really focus

all of our attention,

all of our efforts,

to make sure that we keep

everything running as it should.

- [Mike Rowe Voice

Over] In this case,

d*ck will enlist the help

of his colleague, Doug,

to sort out the issue

before it's too late.

But since temperatures

around the preheater

can easily exceed 200 degrees,

hot enough to boil water,

they'll first need to don

some special equipment.

- So this here is

our silver jackets.

These jackets are designed

for high temperature.

These are crucial to

do this job safely.

This can be an especially

dangerous and hot job,

one that, obviously,

is not a lotta fun,

but it's very necessary.

You ready?

- [Doug] Okay.

(upbeat rock music begins)

- [Mike Rowe Voice Over] While

d*ck and Doug make their way

up to the preheater,

further down the line,

GCC's resident kiln is

churning out hot clinker

at a rate of 100 tons per hour.

But to do that, it needs

a steady supply of fuel,

and making sure that

happens, among other things,

is the job of Process

Attendant, Cody Wiant.

(rock music stops)

(gentle upbeat music begins)

- [Cody Voice Over] Okay, so

we're gonna hop in this loader.

We're gonna go over

to alternative fuels.

Alternative fuels are an

important part of the process

because it provides the

heat for the preheat tower.

What we use here at GCC,

is railroad ties that

have been shredded

and tires that

have been shredded.

So it's actually better

for the environment

because instead of them just

ending up in a landfill,

they run 'em through a shredder

and they're replacing the coal.

- [Mike Rowe Voice Over]

By basically burning trash,

this facility can reduce

their coal consumption by 25%,

but like most things here,

the fuel intake system

needs regular check-ins.

- Each one of these belts

has little paddles set up

and that actually

grabs the material,

whether it be the wood

chips or the tires,

and just pushes it along.

(upbeat rock music begins)

- [Mike Rowe Voice

Over] For the moment,

everything seems to be

in working order here,

leaving Cody to check on another

more troublesome part of

the kiln, the ash output.

- [Cody Voice Over] Our

bottom ash is a wet material

and these bins are metal.

This material, specifically,

likes to get real sticky

and bind to the

sides of this bin,

and it'll be real hard and it

will not fall on the belts.

- [Mike Rowe Voice

Over] And on inspection,

it appears this ash is doing

just what Cody doesn't want.

- So as you can see,

we have zero material

on the bottom ash belt.

And they can see that up there,

so they're not getting

what they're calling for

for the chemistry.

We need to get it going so

we can keep this raw mill up.

- [Mike Rowe Voice Over]

It's not a stretch to say

that concrete is a huge part

of civilized life as we know it.

After all,

it's one of the most consumed

resources in the world,

second only to water.

But just how much

of it do we use?

Well, in a typical year,

just the United States

will mix and pour

more than a hundred

million tons of it,

or enough to build

18 Hoover Dams.

But with construction

surging across the country,

the demand for America's

top building material

is fast on the rise,

which for plants like

GCC's in Southern Colorado,

means they'll need to

grind, fire and ship

a record 5,500 tons of

cement before day's end.

But right off the bat,

Process Attendant, Cody Wiant,

has a big ash

problem on his hands,

'cause the system

responsible for removing it

from the resident

kiln has clogged up.

- [Cody Voice Over] The

reason why that's urgent

is because the computers know,

"Hey, I've been

running this long,

haven't been getting

any bottom ash."

It will shut down.

If that shuts down, that

whole group shuts down,

then you have to take

the whole mill down.

- [Mike Rowe Voice Over]

Fortunately for Cody,

clogs like these

are usually nothing

a few swings from a

sledgehammer can't clear up.

(sledgehammer pounding)

- We're starting to get a

little bit of material coming

from me smacking

it with a sledge.

- [Mike Rowe Voice Over]

But by the look of it,

there's still some

blockage left.

So for a tougher

clog like this one,

Cody will need to

break out the big g*ns,

a pair of air cannons

loaded with 90 psi each.

- If you look up there

above the scaffolding,

that's the air cannons.

When these air cannons hit,

it sends a blast of

air down that pipe,

hits the material and then,

hopefully, frees it up.

So as I pop these open,

each one of those is gonna fire.

(air hissing)

So that's one fire.

There's the second one.

- [Mike Rowe Voice Over]

All that's left now,

is to check and see if the

air cannons did their job.

- And as you can see,

material's nice and

full as it should be.

Yep, everything looks good.

(door slamming)

Gonna be moving

onto the next call.

- [Mike Rowe Voice Over]

Back out in the quarry,

Heavy Equipment

Operator, Anthony Jones,

is dealing with mechanical

issues of his own,

specifically, a rock crusher

that's down for repair.

That doesn't mean

he can't move some

product in the meantime.

- We can head over here and

we can haul some limestone

that we already have crushed

and haul it to the finish mill.

- [Mike Rowe Voice Over] And

since there's not much else

for him to do at the moment,

Anthony will chauffeur this

load to the mill, himself.

- Usually, we have

to haul around

anywhere from 9

to 10 loads a day

of just limestone

addition for these guys.

The limestone here

is what they mix with

the clinker that's already made

right before it's

sent to shipping.

It'll all get

ground up together.

And so, that's why they need us

to haul this

limestone up to them.

(machine whirring)

That's where it should go.

That's the end of the line.

- [Mike Rowe Voice

Over] Not far away,

at the top of GCC's

nine-story preheater,

Control Room Leader,

d*ck Federico,

and his partner,

Doug, are on the hunt,

because somewhere in

this sweltering labyrinth

of hoppers and pipes,

there's a clog.

And if it's not cleared

in the next 30 minutes,

the whole operation will

have to be shut down.

- Okay Doug,

(music stops)

we're gonna start right here.

We're gonna start

opening up some ports.

We're gonna start

up here at the top,

start working our way down,

see if we can't find the plug.

- [Mike Rowe Voice

Over] For d*ck and Doug,

finding the plug straight away

would be the best

case scenario by far.

Not only because it's critical

to keeping the

preheater running,

but also because the ambient

temperature here is 150 degrees

and it only gets hotter

the further down they go.

(metal clanking)

- [d*ck Voice Over] So we're

gonna stick bars in there,

feel around to see if we

feel any kind of a blockage,

any kind of anything.

- [Mike Rowe Voice

Over] But apparently,

this is not their lucky day.

- [d*ck Voice Over] Doug,

I'm not feeling anything yet.

Let's bring our

hammer and our bar,

start working our way down.

Preheater plug's

gonna be very tricky.

They can be from several

different things,

and it is hard work

to find the plug.

- [Doug Voice Over] Oh, I'm

still not feeling anything.

- [d*ck Voice

Over] Come on Doug.

- [Doug Voice Over]

You feel that?

It's hotter every time.

- [d*ck Voice Over] All right,

let's take a look at

this one right here.

(tapping)

Nope.

- [Doug Voice Over]

Okay, we're going lower.

- [Mike Rowe Voice

Over] Unfortunately,

for d*ck and Doug,

there's not much

lower they can go.

- [d*ck Voice Over] We're

gonna have to go to five up.

- [Doug Voice Over] (bleep)

man, it's gonna get bad now.

- [d*ck] Stage five is

the lowest of the vessels.

Right before we actually

hit the feed shelf,

the internal temperatures reach

about 880 degrees Celsius,

so well over 1600

degrees Fahrenheit.

Welcome to hell, Doug.

- [Doug] Here we go.

(metal clanking)

Still not feeling anything.

- [d*ck] Let's go one more time.

- [Doug] Okay.

(metal clanking)

I'm not feeling it.

It's not here.

Argh!

There's only one

place it can be.

- Yeah, we're gonna move

down to the feed shelf.

So it's pretty much one of

the worst case scenarios

we could have.

We're down at the feed shelf

is where the plug is at.

You've got extreme heat from

the kiln, material flying.

It could be pretty tricky.

That being said,

we're gonna get on it.

(upbeat rock music begins)

- [Mike Rowe Voice Over] It

takes quite the workforce

to keep concrete flowing

(truck back-up alarm beeping)

into our everyday lives.

In all, about half a million

men and women operating mines,

mills, mixers,

and massive construction

projects across the country,

and pumping an

annual $50 billion

into our economy as they go.

But with building booms spurring

demand like never before,

the 2000 concrete

manufacturers of our nation

are working harder than ever

to ensure there's

enough to go around.

For GCC's plant in

Southern Colorado,

that means belting out an

uncanny 5,500 tons of cement

before quitting time comes.

But to make that quota,

Control Room Leader, d*ck

Federico and his partner, Doug,

will first need to find a clog

somewhere in the

plant's preheater,

a clog that if left unaddressed,

could shut down the

whole operation.

So having checked

everywhere else,

d*ck and Doug head to

the belly of the beast

in the hopes that

the issue lies there.

- Okay, here we are at the kiln,

and that kiln right there raises

the temperature down here,

a good 50 to a

hundred degrees hotter

than most of the other areas.

- [Mike Rowe Voice Over]

And with that temperature

now reaching 200 degrees,

it's imperative that d*ck

and Doug locate the clog

and clear it fast.

(upbeat rock music begins)

- [d*ck] Let's go over to

this door over here, Doug.

There it is.

Okay, we're gonna go through,

we're gonna bar through this.

(metal clanking)

Starting to see a little

bit of day light there.

Okay, we made some progress,

but we still don't have it.

But there's still a

considerable amount

that's further down

on the feed shelf.

- [Mike Rowe Voice Over]

Having done all they can

with a steel rod,

the guys turn to an air lance

to clear the rest

of the blockage.

- So the air lance is gonna

be a long tube, basically.

It's a long steel tube.

We hook pressurized

air up to it.

The pressure of the air

should help to break up the the

clog that we have down there

and therefore

clearing this plug.

- Let's go ahead

and get this open.

(metal clanking)

Can you gimme a

little bit of air?

(fire sizzling and crackling)

- [Mike Rowe Voice

Over] But even when hit

with a hundred psi,

this clog is proving

tougher than expected.

- Unfortunately, we still have,

we still got a pretty large

chunk down at the bottom.

I hate to say this,

I think we're gonna have

to bring out the big g*ns.

(upbeat rock music begins)

- [Mike Rowe Voice Over] As

you may have noticed by now,

making material

as tough as cement

isn't just hard on

the workers here,

it's also hell on the machinery,

which isn't ideal

when you're trying to run a

round-the-clock operation.

But if everything keeps

cranking as it should,

it'll be in no small part

because of guys like

Millwright's, Billy Bloesser,

whose soul purpose here

is doing whatever it takes

to avoid even the

shortest of shutdowns.

- One thing about this job,

is you never know what you're

gonna come into every day.

You could have a slow

day looking at stuff,

or you could have a fire that's

gotta get out immediately

and get something

running, never know.

- [Mike Rowe Voice

Over] For the moment,

Billy's headed to the

plant's finish mill

where rough chunks of clinker

are crushed into final product

to conduct the near daily task

of ensuring it's in top form.

- We look for wear, any holes,

bad splice, bad rollers,

anything that can take us down.

And all belts have at least

one splice that's

usually a problem area.

Check that and make sure

it's not coming apart.

Splice is good.

Checking oil lines, make

sure they're not leaking,

getting flow.

- [Mike Rowe Voice Over] So far,

everything seems to

be in working order,

but on checking some bolts,

Billy is quick to spot a

red flag or two, or three.

- Bolts, now all

these should be tight,

torqued up, secure.

That's from getting ran hard

to the ground right there,

gettin' beat up.

- [Mike Rowe Voice Over]

The occasional loose bolt

is bound to come up

every now and then,

which is why Billy always

keeps an impact wrench

at the ready.

- Sometimes you need a

little love get on here.

(impact wrench clacking)

All right.

Tight.

(impact wrench clacking)

Looks all tight.

I think we'll get by

till the next time.

Let's keep an eye on

it though to be sure.

- [Mike Rowe Voice Over] While

Billy goes about his rounds

further down the

production line,

at the very end of it, actually,

another of GCC's employees

is managing machinery

of a different kind.

The 1200 rail cars used to

load and haul finished cement

to customers nationwide.

All under the watchful

eye of Terminal Operator,

Gabriel Champion.

- We're in charge of

loading all the cement.

We have to make sure

everything's intact,

all the rail cars and stuff

are in good condition.

We have to keep up on

all the maintenance,

make sure that silo

and all the parts that go into

unloading cement properly,

all that's running efficiently.

And that that happens

24/7/365 days a year.

- [Mike Rowe Voice Over] And

since, for the time being,

all looks as it should,

Gabriel turns focus

to filling his first

rail cars of the day.

(horns blaring)

- Right now, we're

pulling up the empties

out the back of the

back of the locomotives.

We're staging 'em up on the

scales to begin loading.

So right now, just

opening up the hatch

so I can set the spout

in to begin loading.

Got to position it right.

So now I'm gonna head

back into the silo office

and start loading.

(music stops)

- [Mike Rowe Voice Over] In all,

Gabriel can load about 75

tons of cement every hour.

But as he knows all too well,

that's still not enough to

meet the current demand.

- As fast as we can make it,

that's as fast as the

customers are buying it,

so we have to ensure

that everything goes

as smooth as possible.

And right now,

it actually looks like scale

seven is starting to slow down.

I'm gonna have to step outside

really quick and take a look.

Yeah, there's no

cement in the spout.

- [Mike Rowe Voice

Over] It's no secret

that concrete is the preeminent

building material today,

but what does it

bring to the table

that other building

materials don't?

Turns out quite a bit,

starting with the cost.

For the relatively low price

of about 50 bucks a ton,

you've got a product that won't

rust, won't rot, won't burn,

a product that'll insulate you

from the heat, cold,

wind and sound.

A product that can be poured

into any shape or

size imaginable.

You can even build with it

under water if you want.

But perhaps the greatest

thing about concrete

is that because its

ingredients are so common,

it can be made just about

anywhere in the United States.

Take GCC's cement plant in

Southern Colorado for instance,

where nationwide building booms

are spurring 90+ employees

to ship a record

5,500 tons today.

But as Terminal Operator,

Gabriel Champion, can attest,

that's a tough quota to meet

when you've got a rail car

loader that's refusing to load.

So he's headed to what's

known as a 'screen gate,'

where the culprit

can usually be found.

- Essentially,

there's just a gate

that catches the cement powder.

If there's any chunks or any

sort of debris blocking it,

it could stop flow.

And right now, it looks

like there is a few,

so that's what we're getting.

So right now, I'm

just cleaning this out

just so we could

continue to get the flow

into the rail car that we need.

We have to catch this

now because if we don't,

the little problem, just

like the simple chunk,

could actually

cause a big problem

for the customer

when they unload it.

Alrighty, that should be good.

I'm gonna go ahead

and close this up.

We're gonna step back down

and see if that did it.

- [Mike Rowe Voice Over]

To find out for sure,

Gabriel heads back

to the loading spout

and listens for the tell tale

sounds of flowing cement.

- Yeah, so that

looks like it worked.

We're gonna step back

in the silo office

and check the computer

and make sure everything's

working properly.

Right now, it looks like

everything's working good.

Looks like we're getting

flow back up into the car.

Looks like that fixed the issue.

- [Mike Rowe Voice Over] While

Gabriel gets back to loading

rail cars out in the quarry,

things are also looking up

for Heavy Equipment Operator,

Anthony Jones, who after

several hours of busy work

has just gotten word that

the plant's rock crusher

is finally back online.

- Now we can head

back in our loader

and get over there to the

crusher and finish off the dome.

- [Mike Rowe Voice Over]

But as Anthony's colleagues

in the control room are

quick to point out

- [Mike Rowe Voice Over]

They'll need to work fast.

- Oh yeah.

(walkie trilling)

We can definitely get caught up.

- All right, we're

back in business.

First bucket can go back in

the crusher here. Here we go.

- [Mike Rowe Voice Over] One

down, half a dozen to go,

which for a guy like

Anthony, should be no sweat.

He's practically been doing this

since before he could see

over the steering wheel.

- [Anthony Voice Over]

And when I was a kid,

my dad, my grandpa

would be in dozers

and after school

that's what I would do.

I would go play in the dirt,

I'd watch them run

equipment all day,

or I'd sit on the

side of the dozer,

in the old ones with my dad.

Just one day I am gonna do this,

let alone did I

know I'd be running

something triple as big as that.

- [Mike Rowe Voice Over]

And with another 10 tons

of limestone now working

its way through the crusher,

Anthony can finally finish

his day on a high note.

- Alright, we had

a great day today.

Fell behind just a little bit,

but got caught back up.

Ready to get outta here

and go home, relax and

Just ready to go.

- [Mike Rowe Voice

Over] Meanwhile,

not far from GCC's preheater,

Control Room Leader, d*ck

Federico, and his partner, Doug,

still have a stubborn

clog on their hands.

One that could shut down the

whole works any minute now.

So as a last resort,

they've come here to

construct what's known

as a 'car docks blaster.'

- Over here, these are

the car docks tubes.

Once they're built,

what we're hoping to do is

we're gonna sh**t it right out

where we know that

we have the plug

with the high pressure

gases coming out of it.

We're hoping that the percussion

and the actual

pressure from the gas

will dislodge our plug

and be able to keep going.

- [Mike Rowe Voice Over] Car

docks blasters like this one

can deliver 20,000

psi in a single go,

which should be more than

enough to clear the clog,

that is, once it's all

charged. (machine whirring)

- We're charging the tube

up right now with CO2.

This is what gives us

the pressure inside.

(machine alarm beeping)

Okay, get ready Doug.

- [Doug] Ready.

- All right, let's do it.

- [Mike Rowe Voice

Over] Blasters in tow,

all that remains is to

head back to the preheater

with fingers firmly crossed.

- If we don't get

this plug cleared now,

it will be time to

shut down the plants,

so it's do or die.

(metal clanking)

We're gonna insert

the car docks tube

into the actual port now.

- Okay.

- Think we're locked.

Here you go.

Ready?

- Okay.

- Fire in the hole.

(expl*si*n)

Okay, let's get a bar and check.

I think we got it.

Come in, control.

- Yeah, you guys are

seeing what I'm seeing.

10-4. Doug, we got it.

(high fiving)

Good job.

Minutes before we

were gonna go down.

What a relief.

We stuck with it.

We made it happen

and, ultimately,

we kept everything going

and we did it safely.

Again,

great job.

- I'm gonna go to Disneyland.

(laughing)

- [Mike Rowe Voice Over] It's

easy to take everyday things

like concrete for granted.

I mean, it has literally

been holding up civilization

since the Roman Empire,

but what if it didn't?

Well, hopefully,

(playful music begins)

you'd like driving

on dirt roads.

No wait, you need concrete

plants to make automobiles too,

so make that walking

on dirt roads.

Wanna cross a river?

Not without a bridge you don't.

How about building a house?

Sure, you could use

brick or lumber,

but without a foundation

be ready to watch it topple.

(materials crashing)

Point being,

(upbeat rock music begins)

concrete is so pervasive

in life as we know it,

that a world without it

simply couldn't be civilized.

So it's a good thing

that the 2000 concrete

manufacturers of our nation

work day and night

to keep this keystone

commodity in steady supply,

even when building

booms the nation over

push those facilities

to their limit.

Take GCC's plant in

Southern Colorado,

where it's

all-hands-on-deck to deliver

5,500 tons of cement

to the American public

before day's end.

And as you might expect,

that does not leave much time

for setbacks or shutdowns.

So Millwright, Billy Bloesser,

is once again on a mission

to head off issues

before they arise,

which for the moment,

means getting a head start

on some scheduled maintenance

that'll kick off in the morning.

- So tomorrow, we're

on limited downtime

because we're sold out.

A lot riding on getting

stuff quick-fixed

when the machines go down.

So trying to get

as much done today.

Let's get everything ready for

tomorrow so it goes smooth.

- [Mike Rowe Voice

Over] For now,

Billy simply needs

to remove some bolts

from a bucket elevator at

the plant's finishing mill.

But to do it, he'll

need a cutting torch.

And since these bolts

reside about six stories up,

he'll also need a

crane to get it there.

(horn honking)

(equipment whirring)

- We're gonna fly it up,

get staged.

This gonna be a tough pick

'cause we got no head room,

so you gotta boom out,

raise the line up and

down to get it to go in.

- [Mike Rowe Voice Over]

With the welder in place,

the only thing left is for Billy

to get himself to

the top of the tower.

- All right, we're gonna head

to the man basket, get in,

get some more tools up there,

so we get this going.

- [Mike Rowe Voice

Over] Once in position,

Billy makes short work

of the stubborn bolts,

which come tomorrow, will be

one less thing to worry about.

- We got as much done

today as we could,

makes the process as fast

as we can for tomorrow.

Keep the machine running.

We'll be back tomorrow

bright and early.

- [Mike Rowe Voice Over]

Meanwhile, back in shipping,

(train horn blaring)

Operator, Gabriel Champion,

has just a couple

more rail cars to fill

before he can call it a day.

And for that,

he's tagging out

of the control room

to keep an eye on

things down below.

- So now what we're gonna

do is this spout is cleared.

We're gonna wait for him to

clear the top on scale seven.

Once that's done, we'll go

ahead and move the rail cars.

- 10-4. Clear on seven.

(walkie trilling)

You're cleared ahead West

track two, three cars.

(train horn blaring)

- [Mike Rowe Voice

Over] From there,

Gabriel directs the last of

the empty cars into position.

- Three,

two,

one.

I'll stop there.

(horn honking)

We stage the cars,

simultaneously,

both on track two, on

scales three and seven.

And that way we know both

cars are on the scales.

The employee running tops

will set the spout in.

He's just starting up the scale.

So material's gonna

start flowing,

and I'm staying down

here, just waiting,

double checking, making

sure the car doesn't leak,

just like that.

(walkie trilling)

Stop seven.

- And right there, that's

product on the ground.

The door wasn't sealed properly,

so I'm gonna have

to close the door.

(upbeat rock music begins)

- [Mike Rowe Voice Over]

While Gabriel deals with

the cement spillage

over at the raw mill,

Process Attendant, Cody Wiant,

is dealing with issues

of a different kind,

specifically, a bucket elevator

responsible for getting

product off ground level

that's, apparently,

gotten a little gummed

up in the process.

And though you're

probably thinking by now,

"That's a lotta

clogs for one day,"

what can I tell ya?

It's a cement plant.

- As you can see,

it's pulling material.

So now, we gotta get this

other door opened up.

Get some of this

material to clear out.

Awesome, thank you.

(shoveling rocks)

We have to have everything

cleared off, ran off,

no materials, no hazards.

Zach's gonna hop

in that skid steer,

go dumping with

the other reject.

- [Mike Rowe Voice Over]

With the elevator cleared,

all that's left just to

fire it up for a test run.

- George,

(walkie trilling)

can I get local control

on 31503, main drive?

So with this automated system,

I have to call control

(indistinct radio)

and get local control

of the equipment.

I can't just come over

and start hitting

buttons and things work.

- [Radio] (indistinct) local.

- 10-4. Going for a start now.

(walkie trilling)

(upbeat rock music begins)

So you can hear it now, the

waste material is dropping.

That's good, that's

what we want.

If you look right here,

this is a waste sh**t.

Everything comes out here

once this material gets going.

This problem's fixed.

Now we're gonna

move on to the next.

- [Mike Rowe Voice Over]

It's late afternoon

in Southern Colorado.

(shift horn sounding)

An eye on quittin' time for the

folks at GCC's cement plant,

where despite a handful of

setbacks and breakdowns,

the goal of creating

5,500 tons of new product

for an insatiable nation

is nearly complete.

But before you can

clock out for the day,

Process Attendant, Cody

Wiant, has one last job to do.

- So we just got a call

from the control room.

We're gonna head

to the finish mill,

start loading some

gypsum additives.

So we're gonna hop

in this loader,

head that way and

get it filled up.

- [Mike Rowe Voice Over]

Every ton of cement made here

requires 140 pounds of gypsum,

which prevents the

finished product

from setting too quickly.

So to finish off today's quota,

Cody will need to load

another 200 tons of the stuff

into the works,

assuming that is,

the works are still working.

- Hopper's actually

looking a little too full.

Think we might have

a plug going on.

Yeah, it's not

even sucking down.

- [Mike Rowe Voice Over] To

restore flow to the system,

Cody will have to

sleuth out the issue,

and he already has a pretty

good idea of where to look.

- This is the additives tunnel.

We got a hopper

that's plugged up.

As you can see, the

belts are running,

so we're gonna go ahead

and head down now,

see if we can get this

material flowing again.

We gotta kinda hustle.

This is what I'm talking about

when I said if you have

reoccurring issues,

you'll fall behind

and it'll be really hard

to get caught back up.

- [Mike Rowe Voice Over]

In times like these,

Cody is quick to practice

the two golden rules

of maintenance.

Number one: Always use the

right tool for the job.

Number two: The right

tool for the job

is almost always a hammer.

- I got my ladder set up.

I'm gonna head up here,

smack on the side of this bin,

get these feeders

back going again.

(hammer pounding)

Come in, control.

- Can we start those feeders

back up? (walkie trilling)

I got a little bitta

material to fall.

(hammer pounding)

There we go. That's

what we wanted to see.

Now we're flowing.

(conveyor belt clanking)

So we got material

flowing again.

Now hopper should

be emptying out.

I'm gonna head back

up, hop in that loader.

Go continue to load and

move on to the next thing.

- [Mike Rowe Voice Over] Back

in the shipping department,

Operator, Gabriel Champion's,

gonna need more than a hammer

to deal with his latest problem,

because with his final

rail car of the day

hemorrhaging cement,

the only way to stop it

is with a device known as

a 'pneumatic gate opener.'

- So the door on the

bottom of the rail car

wasn't sealed properly,

and you could see we had

a little bit of a spill.

So I'm just gonna come over

here and close that up.

(machine clanking)

(metal pounding)

- [Mike Rowe Voice Over] To

prevent any further leakage,

Gabriel also uses water

to harden the cement

along the door's rim.

- Just waiting for material

to start falling again,

and that'll let me know if I

got this door sealed up good.

- Boom, that looks

like he did it.

Seven's good.

(walkie trilling)

- And now that he's

called out material,

we know we have flow,

and if the door wasn't

sealed properly,

cement would be spilling

on the floor again.

And so we're good to go.

(upbeat rock music begins)

So I moved the spout

out of the way.

I'm gonna step back

on the rail car,

close up the hatch.

(hatch closing)

This ensures the customer knows

that they're not getting

a tampered product.

Alrighty, so we got it done.

That looks like that's gonna

be the last one of the day.

So we got all the cars filled.

(train whistling)

We got all the orders met.

They're all set up for the day.

Being that we're 24/7/365,

I'm gonna go ahead and

set the the night crew up.

But today was a good day.

(train whistling)

- [Mike Rowe Voice Over]

And just like that,

another 5,500 tons of cement

rolls out into the world,

where it'll be mixed and poured

into the countless

concrete structures

that hold up America

as we know it,

from overpasses to cityscapes,

sidewalks to skywalks.

And though, most folks might

not stop to think about

where it all came from

or who made it possible,

come tomorrow,

the concrete makers

of our country will

still be hard at it,

pouring no small amount

of their blood, sweat,

and years into

How America Works.

You simply can't overstate it.

Our appetite for

concrete is insatiable.

How crazy is it right now?

That facility in

Southern Colorado

is sold out of cement

for the next two years.

On the positive side,

that means a ton of opportunity

for anybody who's willing

to get their hands dirty.

You can pour through those

opportunities if you'd like,

over at mikeroweworks.org/haw.

In the meantime,

(laptop closing)